In this project we supplied and installed a small glass floor panel to this Victorian property in Wimbledon, London SW19.

Project Detail

  • Project Duration: 21 Days
  • Location: Wimbledon, London SW19

Project Scope

  • Site survey for initial client estimate.
  • Load modelling by Pilkington Glass
  • Bespoke manufacture by Pilkington Glass
  • Installation

Remarks

In this project we replaced an existing Edwardian glass floor panel that had been deemed unsafe during refurbishment. With glass floors the manufacturer must model the load using computer aided design software to be sure that it will meet building regulations.